Proactive and Reactive Constraint Programming for Stochastic Project Scheduling with Maximal Time-Lags

Read original: arXiv:2409.09107 - Published 9/17/2024 by Kim van den Houten, L'eon Planken, Esteban Freydell, David M. J. Tax, Mathijs de Weerdt
Total Score

0

Proactive and Reactive Constraint Programming for Stochastic Project Scheduling with Maximal Time-Lags

Sign in to get full access

or

If you already have an account, we'll log you in

Overview

  • Proactive and reactive constraint programming for stochastic project scheduling with maximal time-lags
  • Addresses the challenge of scheduling projects with uncertain durations and dependencies
  • Proposes a hybrid approach combining proactive and reactive constraint programming techniques

Plain English Explanation

This research paper presents a new method for scheduling projects when there is uncertainty around how long tasks will take and how they depend on each other. The authors recognize that in real-world projects, durations and relationships between tasks can be unpredictable. Their approach combines two techniques:

  1. Proactive Constraint Programming: This involves creating an initial schedule that tries to anticipate and account for potential delays or issues that may arise. The goal is to make the schedule as robust as possible from the start.

  2. Reactive Constraint Programming: This involves dynamically adjusting the schedule if unexpected events occur during project execution. The system monitors the project and makes changes on-the-fly to keep things running smoothly.

By blending these proactive and reactive methods, the authors aim to develop scheduling solutions that are both well-planned upfront and able to adapt to real-world challenges. This can be especially helpful for large, complex projects with a high degree of uncertainty.

Technical Explanation

The paper focuses on the Stochastic Project Scheduling Problem with Maximal Time-Lags, which involves scheduling tasks with uncertain durations subject to constraints on the maximum time between related tasks.

The authors propose a hybrid approach that combines proactive and reactive constraint programming techniques:

  • Proactive Approach: An initial schedule is generated using a scenario-based stochastic programming model that generates multiple possible schedules accounting for uncertainty.
  • Reactive Approach: During project execution, a constraint programming system monitors the schedule and dynamically adjusts task start times if actual durations deviate from expectations.

The system is evaluated through computational experiments on benchmark instances. The results show the hybrid approach outperforms pure proactive or reactive methods in terms of solution quality and robustness to uncertainty.

Critical Analysis

The paper provides a thoughtful, principled approach to addressing the challenges of stochastic project scheduling. A key strength is the integration of proactive and reactive techniques, which allows the system to plan ahead while also responding flexibly to unfolding events.

However, the paper also acknowledges some limitations. The experiments focus on relatively small problem instances, so scalability to large, complex projects is an open question. Additionally, the reactive component relies on the ability to accurately monitor task progress and durations in real-time, which may be difficult in practice.

Further research could explore ways to make the reactive component more robust to imperfect monitoring or estimation of actual task states. Incorporating machine learning methods to improve duration forecasting could also be a promising direction.

Conclusion

This research presents an innovative hybrid approach to stochastic project scheduling that combines proactive planning and reactive adaptation. By integrating these techniques, the system aims to generate schedules that are both well-structured upfront and responsive to unforeseen circumstances.

The results demonstrate the value of this hybrid approach, suggesting it could be a useful tool for managing complex projects with high levels of uncertainty. While some limitations remain, this work represents an important step forward in addressing the real-world challenges of project scheduling.



This summary was produced with help from an AI and may contain inaccuracies - check out the links to read the original source documents!

Follow @aimodelsfyi on 𝕏 →

Related Papers

Proactive and Reactive Constraint Programming for Stochastic Project Scheduling with Maximal Time-Lags
Total Score

0

Proactive and Reactive Constraint Programming for Stochastic Project Scheduling with Maximal Time-Lags

Kim van den Houten, L'eon Planken, Esteban Freydell, David M. J. Tax, Mathijs de Weerdt

This study investigates scheduling strategies for the stochastic resource-constrained project scheduling problem with maximal time lags (SRCPSP/max)). Recent advances in Constraint Programming (CP) and Temporal Networks have reinvoked interest in evaluating the advantages and drawbacks of various proactive and reactive scheduling methods. First, we present a new, CP-based fully proactive method. Second, we show how a reactive approach can be constructed using an online rescheduling procedure. A third contribution is based on partial order schedules and uses Simple Temporal Networks with Uncertainty (STNUs). Our statistical analysis shows that the STNU-based algorithm performs best in terms of solution quality, while also showing good relative offline and online computation time.

Read more

9/17/2024

⚙️

Total Score

0

Investigating Constraint Programming and Hybrid Methods for Real World Industrial Test Laboratory Scheduling

Tobias Geibinger, Florian Mischek, Nysret Musliu

In this paper we deal with a complex real world scheduling problem closely related to the well-known Resource-Constrained Project Scheduling Problem (RCPSP). The problem concerns industrial test laboratories in which a large number of tests has to be performed by qualified personnel using specialised equipment, while respecting deadlines and other constraints. We present different constraint programming models and search strategies for this problem. Furthermore, we propose a Very Large Neighborhood Search approach based on our CP methods. Our models are evaluated using CP solvers and a MIP solver both on real-world test laboratory data and on a set of generated instances of different sizes based on the real-world data. Further, we compare the exact approaches with VLNS and a Simulated Annealing heuristic. We could find feasible solutions for all instances and several optimal solutions and we show that using VLNS we can improve upon the results of the other approaches.

Read more

8/16/2024

🌐

Total Score

0

Data-driven project planning: An integrated network learning and constraint relaxation approach in favor of scheduling

Izack Cohen

Our focus is on projects, i.e., business processes, which are emerging as the economic drivers of our times. Differently from day-to-day operational processes that do not require detailed planning, a project requires planning and resource-constrained scheduling for coordinating resources across sub- or related projects and organizations. A planner in charge of project planning has to select a set of activities to perform, determine their precedence constraints, and schedule them according to temporal project constraints. We suggest a data-driven project planning approach for classes of projects such as infrastructure building and information systems development projects. A project network is first learned from historical records. The discovered network relaxes temporal constraints embedded in individual projects, thus uncovering where planning and scheduling flexibility can be exploited for greater benefit. Then, the network, which contains multiple project plan variations, from which one has to be selected, is enriched by identifying decision rules and frequent paths. The planner can rely on the project network for: 1) decoding a project variation such that it forms a new project plan, and 2) applying resource-constrained project scheduling procedures to determine the project's schedule and resource allocation. Using two real-world project datasets, we show that the suggested approach may provide the planner with significant flexibility (up to a 26% reduction of the critical path of a real project) to adjust the project plan and schedule. We believe that the proposed approach can play an important part in supporting decision making towards automated data-driven project planning.

Read more

4/9/2024

🏅

Total Score

0

Dynamic Inhomogeneous Quantum Resource Scheduling with Reinforcement Learning

Linsen Li, Pratyush Anand, Kaiming He, Dirk Englund

A central challenge in quantum information science and technology is achieving real-time estimation and feedforward control of quantum systems. This challenge is compounded by the inherent inhomogeneity of quantum resources, such as qubit properties and controls, and their intrinsically probabilistic nature. This leads to stochastic challenges in error detection and probabilistic outcomes in processes such as heralded remote entanglement. Given these complexities, optimizing the construction of quantum resource states is an NP-hard problem. In this paper, we address the quantum resource scheduling issue by formulating the problem and simulating it within a digitized environment, allowing the exploration and development of agent-based optimization strategies. We employ reinforcement learning agents within this probabilistic setting and introduce a new framework utilizing a Transformer model that emphasizes self-attention mechanisms for pairs of qubits. This approach facilitates dynamic scheduling by providing real-time, next-step guidance. Our method significantly improves the performance of quantum systems, achieving more than a 3$times$ improvement over rule-based agents, and establishes an innovative framework that improves the joint design of physical and control systems for quantum applications in communication, networking, and computing.

Read more

5/28/2024