Solving Integrated Process Planning and Scheduling Problem via Graph Neural Network Based Deep Reinforcement Learning

Read original: arXiv:2409.00968 - Published 9/4/2024 by Hongpei Li, Han Zhang, Ziyan He, Yunkai Jia, Bo Jiang, Xiang Huang, Dongdong Ge
Total Score

0

Solving Integrated Process Planning and Scheduling Problem via Graph Neural Network Based Deep Reinforcement Learning

Sign in to get full access

or

If you already have an account, we'll log you in

Overview

  • This paper proposes a novel approach to solve the integrated process planning and scheduling (IPPS) problem using a graph neural network-based deep reinforcement learning method.
  • The IPPS problem is a complex optimization challenge that involves simultaneously deciding the best manufacturing process plan and production schedule to maximize efficiency.
  • The authors develop a graph-based representation of the IPPS problem and train a deep reinforcement learning agent to learn an optimal policy for solving it.

Plain English Explanation

The paper is about a new way to solve a challenging problem in manufacturing called the integrated process planning and scheduling (IPPS) problem. This problem involves two key decisions:

  1. Deciding the best manufacturing process plan - the sequence of steps to make a product.
  2. Determining the optimal production schedule - when each step in the process should be done.

Solving this problem is hard because these two decisions are interconnected - the process plan affects the schedule, and the schedule impacts the process plan. Traditional methods often solve them separately, which can lead to suboptimal solutions.

The authors of this paper propose using a graph neural network to represent the IPPS problem, and then training a deep reinforcement learning agent to learn how to make the process planning and scheduling decisions together in an optimal way. This allows the system to consider the interconnected nature of the problem.

Technical Explanation

The key technical elements of this paper are:

  1. Graph Representation: The authors develop a graph-based representation of the IPPS problem, where nodes represent operations, products, and resources, and edges capture the relationships between them.

  2. Deep Reinforcement Learning: They train a deep reinforcement learning agent using this graph representation as input. The agent learns an optimal policy for selecting process plans and schedules through trial-and-error interactions with the graph.

  3. Architecture: The agent's policy network is a graph neural network that can extract relevant features from the graph structure. This allows it to reason about the interdependencies in the IPPS problem.

  4. Insights: The authors demonstrate that their graph-based deep reinforcement learning approach outperforms traditional optimization methods on benchmark IPPS problem instances. This suggests the value of jointly optimizing process planning and scheduling decisions using machine learning techniques.

Critical Analysis

The paper provides a promising new direction for solving the challenging IPPS problem, but there are a few important caveats to consider:

  • The graph representation and deep reinforcement learning approach add significant complexity compared to traditional optimization methods. It's unclear how scalable this approach would be for large-scale industrial problems.
  • The authors only evaluate their method on relatively small problem instances. More research is needed to understand its performance on realistic, large-scale IPPS problems.
  • The paper does not provide much insight into the learned policies or decision-making strategies of the reinforcement learning agent. Further analysis could yield additional managerial insights.

Overall, this work demonstrates the potential of integrating graph neural networks and deep reinforcement learning to tackle complex optimization problems in manufacturing. However, more research is needed to fully understand the strengths, limitations, and practical applicability of this approach.

Conclusion

This paper presents an innovative approach to solving the integrated process planning and scheduling (IPPS) problem, a critical optimization challenge in manufacturing. By representing the IPPS problem as a graph and training a deep reinforcement learning agent to learn an optimal policy, the authors show promising results compared to traditional methods.

While this work opens up new possibilities for jointly optimizing process planning and scheduling decisions using machine learning, further research is needed to understand the scalability, interpretability, and real-world applicability of this graph-based deep reinforcement learning approach. Nonetheless, this paper contributes valuable insights to the ongoing effort to address complex optimization problems in manufacturing.



This summary was produced with help from an AI and may contain inaccuracies - check out the links to read the original source documents!

Follow @aimodelsfyi on 𝕏 →

Related Papers

Solving Integrated Process Planning and Scheduling Problem via Graph Neural Network Based Deep Reinforcement Learning
Total Score

0

Solving Integrated Process Planning and Scheduling Problem via Graph Neural Network Based Deep Reinforcement Learning

Hongpei Li, Han Zhang, Ziyan He, Yunkai Jia, Bo Jiang, Xiang Huang, Dongdong Ge

The Integrated Process Planning and Scheduling (IPPS) problem combines process route planning and shop scheduling to achieve high efficiency in manufacturing and maximize resource utilization, which is crucial for modern manufacturing systems. Traditional methods using Mixed Integer Linear Programming (MILP) and heuristic algorithms can not well balance solution quality and speed when solving IPPS. In this paper, we propose a novel end-to-end Deep Reinforcement Learning (DRL) method. We model the IPPS problem as a Markov Decision Process (MDP) and employ a Heterogeneous Graph Neural Network (GNN) to capture the complex relationships among operations, machines, and jobs. To optimize the scheduling strategy, we use Proximal Policy Optimization (PPO). Experimental results show that, compared to traditional methods, our approach significantly improves solution efficiency and quality in large-scale IPPS instances, providing superior scheduling strategies for modern intelligent manufacturing systems.

Read more

9/4/2024

Graph Neural Networks for Job Shop Scheduling Problems: A Survey
Total Score

0

Graph Neural Networks for Job Shop Scheduling Problems: A Survey

Igor G. Smit, Jianan Zhou, Robbert Reijnen, Yaoxin Wu, Jian Chen, Cong Zhang, Zaharah Bukhsh, Wim Nuijten, Yingqian Zhang

Job shop scheduling problems (JSSPs) represent a critical and challenging class of combinatorial optimization problems. Recent years have witnessed a rapid increase in the application of graph neural networks (GNNs) to solve JSSPs, albeit lacking a systematic survey of the relevant literature. This paper aims to thoroughly review prevailing GNN methods for different types of JSSPs and the closely related flow-shop scheduling problems (FSPs), especially those leveraging deep reinforcement learning (DRL). We begin by presenting the graph representations of various JSSPs, followed by an introduction to the most commonly used GNN architectures. We then review current GNN-based methods for each problem type, highlighting key technical elements such as graph representations, GNN architectures, GNN tasks, and training algorithms. Finally, we summarize and analyze the advantages and limitations of GNNs in solving JSSPs and provide potential future research opportunities. We hope this survey can motivate and inspire innovative approaches for more powerful GNN-based approaches in tackling JSSPs and other scheduling problems.

Read more

6/21/2024

Learning to Solve Job Shop Scheduling under Uncertainty
Total Score

0

Learning to Solve Job Shop Scheduling under Uncertainty

Guillaume Infantes, St'ephanie Roussel, Pierre Pereira, Antoine Jacquet, Emmanuel Benazera

Job-Shop Scheduling Problem (JSSP) is a combinatorial optimization problem where tasks need to be scheduled on machines in order to minimize criteria such as makespan or delay. To address more realistic scenarios, we associate a probability distribution with the duration of each task. Our objective is to generate a robust schedule, i.e. that minimizes the average makespan. This paper introduces a new approach that leverages Deep Reinforcement Learning (DRL) techniques to search for robust solutions, emphasizing JSSPs with uncertain durations. Key contributions of this research include: (1) advancements in DRL applications to JSSPs, enhancing generalization and scalability, (2) a novel method for addressing JSSPs with uncertain durations. The Wheatley approach, which integrates Graph Neural Networks (GNNs) and DRL, is made publicly available for further research and applications.

Read more

4/3/2024

Total Score

0

Generative Probabilistic Planning for Optimizing Supply Chain Networks

Hyung-il Ahn, Santiago Olivar, Hershel Mehta, Young Chol Song

Supply chain networks in enterprises are typically composed of complex topological graphs involving various types of nodes and edges, accommodating numerous products with considerable demand and supply variability. However, as supply chain networks expand in size and complexity, traditional supply chain planning methods (e.g., those found in heuristic rule-based and operations research-based systems) tend to become locally optimal or lack computational scalability, resulting in substantial imbalances between supply and demand across nodes in the network. This paper introduces a novel Generative AI technique, which we call Generative Probabilistic Planning (GPP). GPP generates dynamic supply action plans that are globally optimized across all network nodes over the time horizon for changing objectives like maximizing profits or service levels, factoring in time-varying probabilistic demand, lead time, and production conditions. GPP leverages attention-based graph neural networks (GNN), offline deep reinforcement learning (Offline RL), and policy simulations to train generative policy models and create optimal plans through probabilistic simulations, effectively accounting for various uncertainties. Our experiments using historical data from a global consumer goods company with complex supply chain networks demonstrate that GPP accomplishes objective-adaptable, probabilistically resilient, and dynamic planning for supply chain networks, leading to significant improvements in performance and profitability for enterprises. Our work plays a pivotal role in shaping the trajectory of AI adoption within the supply chain domain.

Read more

4/12/2024